Alamos Vietnam Company is a professional design consultant, we provide industrial factory estimation services in Binh Phuoc, Alamos is headquartered in Ho Chi Minh City.
Contents
What are the costs of industrial factories?
Alamos Vietnam Company is a professional consulting firm of QS Services in Ho Chi Minh City.
The construction of an industrial factory will consume a lot of costs, so the accurate factory estimate before construction right from the concept design to construction design plays an important role. We understand that this issue is of interest to businesses and investors.
The initial general cost of compensation, support, and resettlement:
including the cost of compensation for land, houses, structures, or related assets; resettlement costs;
expenses for organizing compensation, support, and resettlement;
the cost of using the premises during the construction of steel-industrial structures;
expenses for the technical infrastructure invested in construction and other related costs.
Project Construction Direct Costs:
Construction demolition costs,
Cost of ground leveling,
Expenses for construction of works: structural items, architecture, construction of temporary works, auxiliary works in service of the construction process of warehouse structures, prefabricated factories.
Equipment costs: expenses for procurement of construction equipment and technological equipment;
Expenses for training and technology transfer; installation, testing, and calibration costs; c
Shipping and insurance costs;
Taxes and fees; cost of renting machinery and equipment
Project Management Expenses
Expenses used to organize the implementation of project management work from the project preparation stage until the project implementation and completion of construction to put the steel frame building structure into operation
Project management costs depend on hiring a local or foreign project management unit.
Project Management Cost
Including the cost of actual survey consultancy, preparation of feasibility study report,
Making economic – technical reports, design costs,
Cost of construction inspection and supervision of pre-engineered steel buildings
Other relevant consulting costs.
Important Contingency Expenses:
Contingency expenses for work that may arise (5% of Total Investment)
Provision cost for price slippage during project construction

Dự Toán Nhà Xưởng Tại Hà Nội Năm 2021
Why did you choose Alamos Vietnam to make a QS Services
- Professional construction estimating consultant with many years of experience, we have implemented >200 projects.
- QS engineer team with >10 years of professional experience, implementing >500 projects with a wide range of projects in the high-rise, industrial, complex…
- The progress of making estimates is fast
- Ability to coordinate with design consultants in Architectural and Financial Architects, keeping abreast of budget costs.
- Reputation and responsibility are proven through more than 200 projects that have been and are being implemented
- Competitive price Alamos Vietnam always commits to having the most competitive construction quotation coupled with the quality of the work is always guaranteed and put on the top with a commitment to a lifetime partner with the investor.
- Alamos Vietnam is a professional consultant QS Services
Full Quantity Surveying Services will include:
- Budgeting and tender management
- Making volume BOQ for bid offer
- Prepare and submit bids to contractors and negotiate bid packages
- Submit arising records/progress records
- Reviews & agreements arise
- Cost control & reporting during construction
- Negotiate & agree on the settlement
- Making a construction estimate brings many benefits to the Investor:
QS Services brings many benefits to the Investor such as:
- Know the details of the work that needs to be done to complete the project.
- Get details of the volume of each type of material needed to perform
- Understand the total value of the project before implementation => From there, you can be proactive in choosing the type of material (choosing the brand of materials with the appropriate unit price) or adjusting the design to suit the deadline. desired financial level.
- Planning the construction schedule, cash flow schedule proactively and effectively.
- For Investor – Homeowner: Having an estimated table is the basis for selecting a contractor with an appropriate offer price.
- For contractors: Having an estimated table is the basis for giving an appropriate bid price to ensure profits and avoid risks due to not being able to complete the details of the volume of work to be performed.
- Become a base to surround the bank.

